Olympic Construction logo
Olympic Construction

Wall Ties
 
British Wood Preserving and Damp=proofing Association
 
Trust Mark
 
Propertycare Association
 
Guarantee Protection Insurance
 
Construction Guarantee Services Limited
 
 
The Problem


Cavity walls have been constructed since the beginning of the 20th century and were constructed to offer better protection from the elements as well as reduce the amount of heat lost unnecessarily from a property. The system compromises of two separate walls ‘tied’ at strategic intervals using a form of wall tie commonly made of metal coated in bitumen or zinc.
 
     
 
Wall tie viewed through enderscope   In the 1980’s it became apparent that the wall ties deteriorated much quicker than anticipated leading to the need in Cavity Wall Ties Replacements.

There are many issues associated with failing wall ties: -

Bullet Point   Detection of the problem requires specialist equipment in the form of metal detectors and a borerscope. 
Bullet Point   Failure results in horizontal and stepped cracking of the masonry/mortar.
Bullet Point   Possible bulging of the walls.
Bullet Point   The original building specification may have used too few wall ties.
Bullet Point   The removal of old wall ties if required is often a difficult procedure.

Cavity wall tie viewed through endoscope
   
 
     
  The Solution

Olympic Construction have fully trained and experienced surveyors who have a range of solutions at their disposal to solve wall tie and structural problems.

Our surveyor will recommend the most suitable structural repairs for your property as well as providing a written report for the works to be carried out.

Bullet Point   In order to assess the existing cavity wall ties Olympic Construction use various types of specialist equipment. High quality metal detectors are used to locate the wall ties within the construction.
Bullet Point   After location the condition of the wall ties is assessed using boroscopes.
Bullet Point   After assessment of the cavity wall ties Olympic Construction will put forward a specification for remedial works if required.
Bullet Point   In general terms the remedial work is dependant on the severity of the problem and the specific type of wall tie within the construction. Olympic Construction has an extensive range of high quality stainless steel remedial wall ties to suit almost any application.
Bullet Point   Once completed our remedial works are left to a very high cosmetic standard
 
     
  The result of wall tie failure  
 
The result of wall tie failure
 
     
  Technical Information

Our range of ties include: -

Bullet Point   Mechanical Ties
This kind of tie has mechanically expanding ends that lock into each leaf of the wall. The advantages to this tie is that it can be load tested to ensure correct installation immediately after fitting.
Bullet Point   Resin Ties
This tie is dependant on the resin bond to the base material. This is an excellent solution where the base material is less substantial or unable to take the stress of a mechanical device.
Bullet Point   Combination Ties
For buildings that are constructed of mixed materials a combination of ties provides a robust solution for your replacement needs.
Bullet Point   Drive Fix tie.
Drive fix ties are 7/9mm slim design 304 stainless steel bar, that self taps directly into a small predrilled pilot hole. Provides a quick stress free fixing, with the minimum of disturbance. 
Quality you can trust: Random insitu load testing is performed to ensure that the ties have correctly locked into place and meet the standards required. Testing coupled with long term and GPT guarantees gives you complete peace of mind.
 
  Back to the Top  
Olympic Construction, 8 Privet Street,Springfield, Oldham, Manchester, OL4 2PJ
Telephone: 0161 633 9860 / Mobile: 07966186814